Through fully-mechanized mining fast docking technique theory is analyzed, and combination of Guqiao coal mine, 1121 (1) the specific conditions of fully mechanized working face, and put forward the base line determination, stent azimuth control, elevation and conveyor slope control etc docking effective method. Further illustrates the butt the preparing work before, face butt and equipment docking process, summed up the feasible fully butt technology. Through the scraper conveyor butt joint spacing validation, and the results show that face a butt joint success, when using only 16 h. The technology in the implementation of Guqiao coal mine,not only technically feasible and economically reasonable ,effectively solve the mine irregular shape area mining technology problem, improve the recovery rate of resources. The mine mining, especially the exhaustion of resources type mine reserves potential has certain reference significance.
Key words: Complicated Conditions, Fully-mechanized Mining, Fast Docking Technology
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201401020
http://www.coale.com.cn/EN/Y2014/V46/I1/62
[1] 王绪俊,刘 锋,韩云帅. 刀把式综放工作面对接技术应用[J]. 煤炭工程,2012,5(1):54-55. [2] 张先伟,武志俊. 大倾角综采工作面对接技术实践[J]. 煤炭技术,2007,26(7):45-47. [3] 涂兴子,贾德清. 综采工作面对接及其应用[J]. 煤炭科学技术,1995,23(11):30-34. [4] 张 青. 综采工作面对接与转向技术实践研究[J]. 华北科技学院学报,2010,7(4):9-12. [5] 钱鸣高,石平五. 矿山压力与岩层控制[M]. 徐州:中国矿业大学出版社,2003.