COAL ENGINEERING ›› 2014, Vol. 46 ›› Issue (1): 146-148.doi: 10.11799/ce201401046
Previous Articles
Received:
Revised:
Online:
Published:
Abstract:
Unbalanced bidding strategies to the contractor in this paper is divided into three categories, namely combine with change, pricing, and claim the unbalanced bidding strategies. The basis of analyses the unbalanced quote: construction contract specifications and the quantities bill valuation, to the contractor unbalanced quotation and pricing changes, and claim combined with imbalance quotation is analyzed. In this paper, the unbalanced bidding strategies, and proposes the corresponding strategies from the Angle of the tenderer.
Key words: Engineering quantity list quotation, bidding, imbalance
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201401046
http://www.coale.com.cn/EN/Y2014/V46/I1/146
[1]刘建民. 不平衡报价的识别及风险防范[J].建筑经济,2004(2), 64-65. [2]李建峰. 不平衡报价策略与防范对策的探讨[J].建筑技术, 2005(7): 539-540. [3]崔健. 承包人创收视角下不平衡报价策略研究[D]. 天津理工大学硕士论文, 2012(2): 35-36. [4]刘新奕. 工程量清单招标不平衡报价的应对措施[C]. 第五届西北五省(区)建设工程招标办、交易中心主任联席会议论文汇编, 2012(8): 78-79.