COAL ENGINEERING ›› 2014, Vol. 46 ›› Issue (2): 62-63.doi: 10.11799/ce201402022
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
Abstract: This paper is Lee Coal 569 m shaft auxiliary shaft hoist DC motor drag electronic control system for the research object, the elevator is running too fast conversion layer, instability and other issues, combined with the actual situation and operating personnel and technical levels, and put on a hoist heavy devolution and decentralization of light load on the lift for different conditions such as velocity-depth analysis. Propose practical solutions to improve and modify the PLC program through the host computer methods for investigation and treatment, proven that this method completely solves the auxiliary shaft hoist mine too fast conversion layer problems, and achieved satisfactory results for speed control .
Key words: Keywords:Mine hoist, PLC, DC control system, Digital DC speed regulation
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201402022
http://www.coale.com.cn/EN/Y2014/V46/I2/62
[1].周斐.矿井提升机ASCS电控系统典型故障现场处理技术探讨.制造业自动化,2012,34(22 [2].廉王龙.基于PLC控制的全数字直流提升机电控系统.煤,2009,18(3 [3]李东.矿井提升机减速器的常见故障及解决方案[J].矿山机械,2005,(8):69-71 [4].杨兴瑶.电动机调速的原理及系统[M].北京:水利电力出版社.2004 [5].卢 燕.矿井提升机电力拖动与控制[M].北京:冶金工业出版社,2001 [6]王峰, 何风有.串联6RA70调速系统的网络控制[J][J].金属矿山,2009,(1):115-117 [7].魏英琴,张涵成庄矿副井提升机电控系统改造研究[J] .煤矿机械,2010,31 (3):178-180 [8]李连彪,王峰.PROFIBUS网络在数控提升机中的应用[J][J].工矿自动化,2003,(5):32-33 [9].廖常初.可编程程序控制器的应用技术[M],重庆:重庆大学出版社,1992 [10].张国庆.矿井提升机PLC电控的应用与思考[J].山西煤炭,2010(6):152—156