COAL ENGINEERING ›› 2014, Vol. 46 ›› Issue (5): 42-44.doi: 10.11799/ce201405014
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
the paper takes the East5# ramp soft rock of a coal mine in Shaanxi Tongchuan Mining Company’s as the research object, and uses similar material simulation methods to study failure characteristics and failure mechanism of soft rock roadway, the paper summed the process of roadway deformation and failure modes, through observation and analysis for appearance of the destruction morphological characteristics of the roadway; the paper summed the process of roadway surrounding rock deformation in the loading conditions through the monitoring of surrounding rock displacement;the paper summarized bolt anchor working condition through monitoring and analysis for bolt anchorage force. Finally,the paper summarizes characteristics of deformation and failure process of high-stress soft rock roadway with large section.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201405014
http://www.coale.com.cn/EN/Y2014/V46/I5/42
[1] 陈浩.地下工程围岩与支护体相互作用的模型试验研究与理论分析[D].武汉:中国科学院武汉岩土力学研究所,2008. [2] 何满潮. 中国煤矿锚杆支护理论与实践[M].北京:科学出版社,2004. [3] 李世平.岩石力学简明教程[M].中国矿业大学出版社,1986.6. [4] 付国彬.巷道围岩破裂范围与位移的新研究[J].煤炭学报,1995(3):304-310. [5] L.V Rabcewicz.The New Austrian tunneling method [J] . Water Power,1965 (4):19-24. [6] 杨双锁.回采巷道围岩控制原理及锚固结构的适应性研究[D].徐州:中国矿业大学2001.