Abstract:
Abstract: To solve the problem of high dust concentration hazard caused by whole rock tunnel excavation,aiming at the rock dust hazards of Zhangji coal mine working face,the paper put forward to create a combined system which gives priority to froth dedusting,dust exhausting fan,assits with the grade purified water curtain and individual protection,and put it into application at the 1123(3)~1124(3) gas drainage lane. The results show that the average dust-settling effect is 92.5% and 96% for the total dust and respirable dust. Cooperating with individual protection and the water curtain,the combined system has achieved a good effect of controlling dust.
Key words: whole rock tunnel, fully mechanized excavation face, dust hazards, comprehensive dust control
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201406020
http://www.coale.com.cn/EN/Y2014/V46/I6/56