COAL ENGINEERING ›› 2014, Vol. 46 ›› Issue (9): 20-22.doi: 10.11799/ce201409007
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
When ordinary method changes in freezing method in coal mine construction, antifreeze protection measures must be taken for the forming wall in common construction method. The effective method is the temperature control hole controlling the development of freezing front, but there are no specifications and theoretical supports for the temperature control hole design in protection of the forming wall. With the help of the finite element numerical simulation software-ANSYS, the article has done a preliminary study about design of the temperature control hole in Tashidian air shaft construction, and summarizes the design method.
Key words: Protection of Forming Wall, Temperature Control Hole, Heat Flux Density
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201409007
http://www.coale.com.cn/EN/Y2014/V46/I9/20
[1] 马国庆,钱玉林,混凝土的冻害及其机理[J].《常州工学院学报》2005年12月28卷增刊:109~112。 [2] 张涛,齐善忠. 局部保温条件下单管冻结温度场研究[J]. 《山西建筑》第32卷第7期:137~138。 [3] 姚直书,程桦等,西部地区深基岩冻结井筒井壁结构设计及优化[J].《煤炭学报》2010年5月第35卷第5期: 760~764。 [4] 陈文豹,徐光济,建井工程手册(第四卷)1984年。