Abstract:
In the process of shaft belonged to PiLiQing coal throughing the soil layer adopted the ordinary method , the formation revealed is loosed thick loess, poor stability, in order to ensure the safety of construction of this section, in combination with the construction operation, economic and other aspects, through research, experiment and field, for the first time using T-steel inserted into the construction scheme of loess, hang tight hole, and to validate the actual effect of construction the technical scheme, provides feasible construction of to through the thick loess by the ordinary method.
Key words: Thick loess, The ordinary method, the wall hanging used T-steel
CLC Number:
TD352
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201410027
http://www.coale.com.cn/EN/Y2014/V46/I10/100
[1]张克恭,刘松玉.土力学[M][J].中国建筑工业出版社,2011,:- [2]张永兴.岩石力学[M][J].中国建筑工业出版社,2004,:- [3]董方庭.井巷设计与施工[M][J].中国矿业大学出版社,1994,:- [4]崔云龙.简明建井工程手册[M][J].煤炭工业出版社,2000,:-