COAL ENGINEERING ›› 2014, Vol. 46 ›› Issue (10): 188-191.doi: 10.11799/ce201410053
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
Aiming to larger prediction error of discharge and mine water bursting cannot be managed due to mine drainage ability, the paper studyed the main factors affecting mine discharge based on the secular dynamic variation rule of mine discharge in Longgu mine. First, revealed variation of water-filling factor of mining effects on prediction of discharge. The numerical method was used to predict the dynamic variation of mine discharge in the mine excavation process with mine development progress. The results showed that compared with the previous simulation method that scope were unchanged, if considering the excavation sequence and real-time adjusting pumping wells for simulating discharge, taking the simulating results that coal extraction in advance as initial flow field of later model, the prediction of discharge would be more accurate, the calculation error was reduced to some extent. It had more spreading values by above method.
Key words: mining process, mine discharge, dynamic forecast, numerical simulation method
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201410053
http://www.coale.com.cn/EN/Y2014/V46/I10/188
[1] 武强,江中云,孙东云,等.东欢坨矿顶板涌水条件与工作面水量动态预测[J].煤田地质与勘探,2000:28(6),32-35. [2] 金圣杰.三都隧道施工涌水量的动态预测研究[D].成都理工大学,2012. [3] 陈利娟. 鱼田堡煤矿矿坑水动态分析及涌水量预测[D].成都理工大学,2009. [4] 刘建,刘丹.利用BP神经网络模型动态预测隧道涌水量——以铜锣山隧道为例[J].现代隧道技术,2012:49(3),62-66. [5] 齐跃明.矿区岩溶地下水动态的随机模拟及应用研究[D].中国矿业大学,2009. [6] 陈琳.基于GMS的矿井涌水量预测分析[D].辽宁师范大学,2011. [7] 陈南春.矿井涌水量动态预报模型[J].系统工程,1991:9(5),61-71. [8] 王建秀,朱合华,叶为民.隧道涌水量的预测及其工程应用[J].岩石力学与工程学报,2004:23(7),1150-1153. [9] 任虎俊,段俭君,胡婉,等.山西潞安集团李村煤矿水文地质条件及矿井涌水量预测[J].中国煤炭地质,2013:25(5),27-31. [10] 李贵仁,赵珍,陈植华.数值模拟在反演矿区水文地质条件中的应用[J].水文地质工程地质,2013:40(2),19-23.