COAL ENGINEERING ›› 2015, Vol. 47 ›› Issue (2): 47-49.doi: 10.11799/ce201502015

Previous Articles     Next Articles

Application of Digging anchor integration in Wanli No.1 Coal Mine and ways to improve efficiency

  

  • Received:2013-12-30 Revised:2014-02-25 Online:2015-02-10 Published:2015-02-15

Abstract: This paper describes the use of driving anchor machine to achieve the dig anchor integration and the application in Wanli No.1 coal Mine, Shenhua Group. Based on the analysis of specific digging efficiency in 2011, 2012 and the rate of comprehensive utilization of equipment in 2012 in Wanli No.1 coal Mine, summarized the factors affect-ing driving efficiency, and combined with the lean management theory. A scheme is pre-sented from the roadway supporting parameters optimization, improved equipment com-prehensive utilization, incentive mechanism, etc, to form the reasonable digging anchor speedy drivage technology, improving specific digging efficiency. It can provide a refer-ence for similar mines realize speedy drivage.

Key words: Dig anchor integration, Supporting parameters optimization, Lean management, Specific digging efficiency

CLC Number: