COAL ENGINEERING ›› 2015, Vol. 47 ›› Issue (2): 123-125.doi: 10.11799/ce201502040

Previous Articles     Next Articles

Operation System Simulation and Optimization of Open-pit Mine Based on GPSS/H

  

  • Received:2014-10-07 Revised:2014-11-12 Online:2015-02-10 Published:2015-02-15