COAL ENGINEERING ›› 2016, Vol. 48 ›› Issue (3): 27-28.doi: 10.11799/ce201603009
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract: ZhuJi west coal mine coal preparation plant products silo construction period is long,difficult,measures of the high cost, safe hidden trouble, in view of silo roof structure characteristics of the design optimization of construction scheme,Under the premise that ensure the safety of engineering construction,Reduce the construction period,reduce construction cost, accomplish a task according to schedule. This project adopts the cable stayed steel wire rope hanging synovial operating steel platform as a support warehouse top construction steel structure platform construction scheme,Solve the difficult problem,Achieve goals and objectives. Similar projects for reference.