COAL ENGINEERING ›› 2016, Vol. 48 ›› Issue (5): 27-30.doi: 10.11799/ce201605009

Previous Articles     Next Articles

Project Design and Practice of 0.5Mt/a CWS Plant in Jiangyin

  

  • Received:2016-03-17 Revised:2016-04-25 Online:2016-05-10 Published:2016-06-15

Abstract: In the economically developed regions, the contradiction between energy demand and environmental pollution is increasingly prominent. It is an effective way to reduce the total emissions and improve the quality of the environment type CWS plant, high concentration grinding and pulping technology was designed and used. This paper emphatically introduces the main production process and the device configuration, as well as industrial production commissioning. Results show that the quality of CWS can achieve the design requirements and the product can fully meet the user’s demands.

CLC Number: