COAL ENGINEERING ›› 2016, Vol. 48 ›› Issue (5): 56-58.doi: 10.11799/ce201605018
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract: Mine in 21203 Fully Mechanized cut in the mountain exploration put old empty water engineering design, construction process, from the special probe Roadway design, drill field protection, comprehensive exploration drilling water control orifice means drilling for design and construction management, Yungaishan Well Field 1 seam drilling escape security technology under construction in soft thick seam conditions to ensure the safety of construction projects and achieved significant safety and economic benefits.
CLC Number:
TD745
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201605018
http://www.coale.com.cn/EN/Y2016/V48/I5/56