Rapid installation technology and application of fully mechanized caving faces with complicated condition

  

  • Received:2015-09-28 Revised:2015-05-28 Online:2016-05-10 Published:2016-06-15

Abstract: Because of geological conditions changes, cut of No.1306 workface was arched of Guo-jiahe coal mine, that made the installation difficult. Aimed at the situation, studied and proposed technical way to install rapidly of fully mechanized caving faces, which realized the workface installed rapidly, safety and economization. Applying this technology, it provides a mature technology experience for installing the workface with the similar conditions.