[1] |
.
Reasonable location of the roadway and the technology of surrounding rock control in isolated coal pillar
[J]. COAL ENGINEERING, 2017, 49(5): 11-14.
|
[2] |
.
[J]. COAL ENGINEERING, 2016, 48(9): 51-53.
|
[3] |
.
[J]. COAL ENGINEERING, 2016, 48(5): 4-7.
|
[4] |
.
Analysis on the Reasonable layout of air return Tunnel on the Steeply Dipping Thick coal seam fully mechanized working face
[J]. COAL ENGINEERING, 2015, 47(6): 4-6.
|
[5] |
.
Gob-side Entry Driving Scheme Optimization in (No.6) Mine of Pingdingshan Coal Industrial Group
[J]. COAL ENGINEERING, 2015, 47(3): 50-52.
|