Application of the Pre-excavation in the Mining Area of Continuous Mining

  

  • Received:2015-07-30 Revised:2015-11-09 Online:2016-07-10 Published:2016-07-22

Abstract: Aiming at the problem that the continuous mining of first coal layer of the Xinji second mine is in a tense situation, the limitation for continuous mining in superseding time can be settled effectively by employing the reserved narrow coal pillar and roadway excavation technology in 2101 mining zone, and at the same time realize the continuous mining of woking faces and obtain good social and economic effects.