COAL ENGINEERING ›› 2017, Vol. 49 ›› Issue (1): 4-6.doi: 10.11799/ce201701002

Previous Articles     Next Articles

Setting of Deputy inclined ramp hedge Chamber

  

  • Received:2016-01-07 Revised:2016-02-22 Online:2017-01-09 Published:2017-04-13

Abstract: Deputy gentle downhill slope for the distance of trackless transport, easily lead trackless transport equipment brake system failure to produce accidents, this paper proposes measures to reduce losses caused the accident, one of the main measures to avoid setting the gentle slope of the deputy insurance chamber, the text incorporated by practice theoretical research survey data on hedge chamber composition, location selection, length and slope selection, chamber section settings were calculated design, draw the corresponding conclusions for similar design reference .

CLC Number: