COAL ENGINEERING ›› 2017, Vol. 49 ›› Issue (2): 52-55.doi: 10.11799/ce201702017
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract: Mine in the layout of the fully mechanized working face, tend to be faults, erosion and other geologic conditions or affected by the mine with irregular boundary. In these areas should not be arranged in regular shape of strip shape in fully mechanized coal mining face, corner of fully mechanized coal face outside the area can only be the Wongawilli mining method mining or abandoned mining, the recovery rate is greatly reduced, causing tremendous waste of coal resources. In order to solve this problem, we further improve the resource recovery rate of these regions, and the trend of the coal mine is based on the geological structure, and the inclined length of the fully mechanized face can be lengthened or shortened. In addition to the layout of the roadway, the equipment on the surface of the installation of the new requirements, this paper for the full mechanized mining face layout design and working surface equipment installed in a detailed study, the results are applicable to all existing irregular area layout of the fully mechanized coal face.
CLC Number:
TD263
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201702017
http://www.coale.com.cn/EN/Y2017/V49/I2/52