COAL ENGINEERING ›› 2017, Vol. 49 ›› Issue (8): 63-66.doi: 10.11799/ce201708018
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract: To solve the problems of Liu-zhuang coal mine the east wind well the third aquifer hydrological hole delayed overflow, the freezing parameters of the shaft, the hydrogeological conditions, and the investigation and analysis of the hydrological hole were investigated.The results indicate that The the main reason is the reported of the strata water abundance weak and large porosity and put forward the corresponding methods.
CLC Number:
TD265.3
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201708018
http://www.coale.com.cn/EN/Y2017/V49/I8/63