[1] |
.
[J]. COAL ENGINEERING, 2019, 51(1): 7-11.
|
[2] |
.
[J]. COAL ENGINEERING, 2018, 50(10): 66-69.
|
[3] |
.
Innovation Design of Extra Large Drilling in Hongqinghe Mine
[J]. COAL ENGINEERING, 2018, 50(8): 7-9.
|
[4] |
.
[J]. COAL ENGINEERING, 2018, 50(6): 4-7.
|
[5] |
.
[J]. COAL ENGINEERING, 2018, 50(4): 3-4.
|
[6] |
.
Underground reservoir construction feasibility analysis in 8.0m super large mining height working face
[J]. COAL ENGINEERING, 2018, 50(2): 6-9.
|
[7] |
.
[J]. COAL ENGINEERING, 2018, 50(1): 10-12.
|
[8] |
.
[J]. COAL ENGINEERING, 2017, 49(10): 43-47.
|
[9] |
.
Design Research on Xinjiang Zhundong Wucaiwan No.1 Mine Industrial Site Location Selection and Development Method
[J]. COAL ENGINEERING, 2017, 49(8): 36-38.
|
[10] |
.
Discussion on the Design of Green and Safety Mining System in km deep Coal Mine
[J]. COAL ENGINEERING, 2017, 49(7): 4-7.
|
[11] |
.
To explore the old mine gangue in Pingdingshan mining area system
[J]. COAL ENGINEERING, 2017, 49(2): 5-6.
|
[12] |
.
[J]. COAL ENGINEERING, 2017, 49(2): 14-16.
|
[13] |
.
The Discussion of the Questions about Development Mining System
[J]. COAL ENGINEERING, 2017, 49(2): 7-9.
|
[14] |
.
Setting of Deputy inclined ramp hedge Chamber
[J]. COAL ENGINEERING, 2017, 49(1): 4-6.
|
[15] |
.
Optimized Design on Miluo Coal Mine to??Quickly?Production
[J]. COAL ENGINEERING, 2016, 48(12): 5-6.
|