[1]乌荣康.我国高产高效矿井建设与发展[J].煤炭科学技术, 2003, 31(1):1-4 [2]WU Rong-kang.Construction and development of high production and high efficient mine in China[J][J]., 2003, 31(1):1-4 [3]宋振骐,崔增娣,夏洪春,汤建泉,文志杰.无煤柱矸石充填绿色安全高效开采模式及其工程理论基础研究[J].煤炭学报, 2010, 35(5):705-706 [4]SONG Zhen-qi,CUI Zeng-di,XIA Hong-chun,TANG Jian-quan,WEN Zhi-jie.The fundemental theoretial and engineering research on the green safe no coal pillar mining model by mainly using coal gangue backfill[J].JOURNAL OF CHINA COAL SOCIETY, 2010, 35(5):705-706 [5] 尹根成,张军..沿空留巷技术研究与应用[J].煤炭工程,2007,(05): 32 ~ 34. [6]YIN Gen-cheng,ZHANG Jun.Research and Application of Gob side Entry Retaining Technology [J]. Coal Engineering,2007,(05): 32~34. [7] 孙恒虎,赵炳利.沿空留巷的理论与实践[M].北京:煤炭工业出版社,1993:51~71. [8]SUN Heng-hu,ZHAO Bing-li.Theory and practice of gob-side entry retaining[M]. Beijing:China Coal Industry Publishing House,1993:51~71. [9] 华心祝.我国沿空留巷支护技术发展现状及改进建议[J].煤炭科学技术,2006:34(12):78~81. [10]HUA Xinzhu.Development status and improved proposals on gob-side entry retaining support technology in China[J]. Coal Science and Technology,2006:34(12):78~81. [11] 钱鸣高,缪协兴,许家林,等.岩层控制的关键层理论[M].北京:中国矿业大学出版社,2000:87~91. [12]QIAN Ming-gao,MIAO Xie-xing,XU Jia-lin,et al.Key strata theory in ground control[M].Beijing:China University of Mining and Technology Press,2000:87~91. [13]李化敏.沿空留巷顶板岩层控制设计[J].岩石力学与工程学报, 2000, 19(5):651-654 [14]LI Hua-min.Control design of roof rocks for gob-side entry[J].Chinese Journal of Rock Mechanics and Engineering, 2000, 19(5):651-654 [15]张东升,茅献彪,马文顶.综放沿空留巷围岩变形特征的试验研究[J].岩石力学与工程学报, 2002, 21(3):331-334 [16]ZHANG Dong-sheng,MAO Xian-biao,MA Wen-ding.Testing study on deformation features of surrounding rocks of gob-side entry retaining in fully-mechanized coal face with top-coal caving[J].Chinese Journal of Rock Mechanics and Engineering, 2002, 21(3):331-334 [17] 柏建彪,周华强,侯朝炯,等.沿空留巷巷旁支护技术的发展[J]. 中国矿业大学学报,2004, [18](2):183~186. [19]BAI Jian-biao,ZHOU Hua-qiang,HOU Chao-jiong,et al.Development of support technology [20]beside roadway in gob-side entry retaining for next sublevel[J].Journal of China University of Mining and Technology,2004,33(2):183~186. [21] 马立强,张东升,陈涛,等.综放巷内充填原位沿空留巷充填体支护阻力研究[J]. [22]岩石力学与工程学报,2007,26(3):544~550. [23]MA Li-qiang,ZHANG Dong-sheng,CHEN Tao,et al.Study on packing body supporting resistance of enter-in packing for in-situ gob-side entry retaining in fully-mechanized top-coal caving mining face[J].Chinese Journal of Rock Mechanics and Engineering, 2007, 26(3):544-550 [24]马立强,张东升,王红胜,等.厚煤层巷内预置充填带无煤柱开采技术[J].岩石力学与工程学报, 2010, 29(4):674-680 [25]MA Li-qiang,ZHANG Dong-sheng,WANG Hong-sheng,et al.Mining technique with preset packing body in roadway for thick coal seam without coal pillars[J].Chinese Journal of Rock Mechanics and Engineering, 2010, 29(4):674-680 [26] 费旭敏.我国沿空留巷支护技术现状及存在的问题探讨[J]. 中国科技信息,2008,21(7): [27]~49. [28]FEI Xu-min.The status of support technology on gob-side entry retaining roadway and existing problem discussion[J].China Science and Technology Information, 2008, 21(7):48-49 [29]何满潮,曹伍富,单仁亮,王树理.双向聚能拉伸爆破新技术[J].岩石力学与工程学报, 2003, 22(12):2047-2051 [30]He Man-chao,Cao Wu-fu,Shan Ren-liang,Wang Shu-li.New Blasting Technology — [31]Bilateral Cumulative Tensile Explosion[J].Chinese Journal of Rock Mechanics and Engineering,2003,22(12):2047~2051. [32]何满潮,郭志飚.恒阻大变形锚杆力学特性及其工程应用[J].岩石力学与工程学报, 2014, 33(7):1297-1307 [33]He Man-chao,Guo zhi-biao.Mechanical Property and Engineering Application of Anchor Bolt with Constant Resistance and Large Deformation[J].Chinese Journal of Rock Mechanics and Engineering, 2014, 33(7):1297-1307