COAL ENGINEERING ›› 2018, Vol. 50 ›› Issue (12): 13-16.doi: 10.11799/ce201812004
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract: Abstract:Starting from the Lianghuai mining area in the deep mine,Briefly pressed deep mine chamber support technology status,characteristics and the content, method and technical path of the research. This article through to Kou Zi Dong mine main shaft skip loading chamber engineering geological condition analysis,the selection and optimization of the loading chamber design of supporting scheme, put forward (rod, anchor cable) and shotcrete, steel and reinforced concrete combined support form the straight wall rib beam reinforcement, the support effect and economy increase.
CLC Number:
TD354
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201812004
http://www.coale.com.cn/EN/Y2018/V50/I12/13