| [1] |
.
Interference analysis of cooperative operation between advance support equipment and roadheader
[J]. Coal Engineering, 2023, 55(10): 118-124.
|
| [2] |
.
Study on rock breaking load and specific energy of shaft roadheader SBR pick cutter based on numerical simulation
[J]. Coal Engineering, 2022, 54(11): 138-143.
|
| [3] |
.
Research on path tracking of road-header based on BP neural network
[J]. Coal Engineering, 2022, 54(4): 156-161.
|
| [4] |
.
Prediction control for cutting head speed of roadheader based on fuzzy mathematics and IPSO-BP algorithm
[J]. Coal Engineering, 2022, 54(2): 172-176.
|
| [5] |
.
Research on position and pose calculation algorithm of boom-type roadheader based on strapdown inertial navigation
[J]. Coal Engineering, 2020, 52(9): 170-176.
|
| [6] |
.
Analysis and Study of EBH315 Roadheader’s Cutting Experiment
[J]. COAL ENGINEERING, 2018, 50(11): 0-0.
|
| [7] |
.
Vibration Analysis of Roadheader Cutting Reducer Based on Variational Mode Decomposition
[J]. COAL ENGINEERING, 2018, 50(10): 173-177.
|
| [8] |
.
Research on course angle accuracy of roadheader based on laser measurement
[J]. COAL ENGINEERING, 2018, 50(7): 107-110.
|
| [9] |
.
The dsign and research on broken hammer flding mechanisms of roadway repair machine
[J]. COAL ENGINEERING, 2018, 50(3): 155-157.
|
| [10] |
.
Study on Longitudinal Deformation Properties of Rubber Mats between Segment Rings of Coal Mine Roadway Constructed by Shield
[J]. COAL ENGINEERING, 2018, 50(2): 120-123.
|
| [11] |
.
[J]. COAL ENGINEERING, 2017, 49(10): 158-161.
|
| [12] |
wang fuqiang.
Test and Analysis of EBZ260TY Roadheader’s Integrated Dust Removal System in the Simulated Roadway
[J]. COAL ENGINEERING, 2017, 49(6): 135-138.
|
| [13] |
.
The use of EBH315 type road-header in the whole-rock tunnel with steep slope in Canadian Murrey River Coal-Mine
[J]. COAL ENGINEERING, 2017, 49(4): 56-58.
|
| [14] |
.
Research on Influence Rule of Girth Type Air Ejector Device
[J]. COAL ENGINEERING, 2016, 48(11): 97-99.
|
| [15] |
.
Autonomous Cutting Control System of Longitudinal Roadheader Based on PCC
[J]. COAL ENGINEERING, 2016, 48(6): 132-135.
|