In this paper, Based on the Xinjulong No. 2 auxiliary transportation roadway as engineering background, the experimental research on field monitoring, theoretical analysis, research methods, the engineering analogy combined, according to the problems of large section roadway excavation in hard rock, the digging machine selection, cutting process, temporary supporting technology, research of long distance continuous auxiliary transportation safety and quality, achieve comprehensive mechanization tunneling of large section roadway in deep hard rock .
Key words: Deep hard rock, speedy drivage, construction technology
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201409020
http://www.coale.com.cn/EN/Y2014/V46/I9/58
[1] 刘文民, 刘善勇. 龙固矿井辅助运输系统优化[J]. 山东煤炭科技,2011,(03). [2]刘文民, 沈曰勇. 龙固矿井辅助运输管理体系的建设实践[J]. 山东煤炭科技,2010,(05) [3] 卢诗祥. 复杂条件下大断面托顶煤掘进巷道支护技术[J]. 山东煤炭科技,2009,(06) [4] 潘宏. 综合机械化掘进技术在全煤巷的应用[J]. 中国科技博览,2012,(22) . [5] 高永德. 浅谈综掘快速掘进技术[J]. 中国科技博览,2012,(21). [6] 郝利生. 煤巷综合机械化掘进技术[J]. 价值工程,2012,(30). [7] 王庆一中国煤炭工业:演变及前景(上)[]J.中国煤炭,2001(1).