COAL ENGINEERING ›› 2016, Vol. 48 ›› Issue (5): 56-58.doi: 10.11799/ce201605018

Previous Articles     Next Articles

Yungaishan 1 Coal Mine Exploration put two old construction technique empty water

  

  • Received:2015-04-21 Revised:2015-07-11 Online:2016-05-10 Published:2016-06-15

Abstract: Mine in 21203 Fully Mechanized cut in the mountain exploration put old empty water engineering design, construction process, from the special probe Roadway design, drill field protection, comprehensive exploration drilling water control orifice means drilling for design and construction management, Yungaishan Well Field 1 seam drilling escape security technology under construction in soft thick seam conditions to ensure the safety of construction projects and achieved significant safety and economic benefits.