| [1] | . 
														
															Research on roof hydraulic fracturing control technology of roadway deformation in Guqiao coal mine
														[J]. Coal Engineering, 2021, 53(5): 0-0. | 
																																																																																
													| [2] | . 
														
															Influence of Direction of Maximum Principal Stress on Stability of Roadway
														[J]. Coal Engineering, 2021, 53(2): 0-0. | 
																																																																																
													| [3] | . 
														
															Large Height Mining Working Face Coal Wall Rib Spalling Lever Stability Analysis in Xiao Bao-dang Mine
														[J]. Coal Engineering, 2020, 52(12): 97-101. | 
																																																																																
													| [4] | . 
														
															Analysis of the movement law and cutting seam parameters in gob side entry retaining under hard roof condition
														[J]. Coal Engineering, 2020, 52(11): 98-102. | 
																																																																																
													| [5] | . 
														
															Mechanical characteristics of constant resistance and large deformation anchor rope and its application in deep gob-side entry retaining by cutting roof
														[J]. Coal Engineering, 2020, 52(11): 103-107. | 
																																																																																
													| [6] | . 
														
															Study on Control Technologies of Floor Heave in Gob Side Entry Retaining with Block Filling
														[J]. Coal Engineering, 2020, 52(10): 34-38. | 
																																																																																
													| [7] | . 
														
															
														[J]. Coal Engineering, 2020, 52(9): 47-51. | 
																																																																																
													| [8] | . 
														
															Study on small coal pillars size next goaf at fully mechanized sublevel caving face 8800 of Nanyangpo coal mine
														[J]. Coal Engineering, 2020, 52(7): 63-67. | 
																																																																																
													| [9] | . 
														
															Analysis on the mechanism and effect of initial toppling caused by hydraulic fracturing in Zhangjiamao coal mine
														[J]. Coal Engineering, 2020, 52(6): 91-95. | 
																																																																																
													| [10] | . 
														
															Study on Application of Phase High Water Material Filling along Empty Lane in Daning Coal Mine
														[J]. Coal Engineering, 2020, 52(4): 6-11. | 
																																																																																
													| [11] | . 
														
															Research on Location of Roadway of External-Misaligned Stagger Arrangement in Near Horizontal Thick Coal Seam
														[J]. Coal Engineering, 2019, 51(9): 0-0. | 
																																																																																
													| [12] | . 
														
															Rock Structure Type and Numerical Simulation Analysis of Stability of Roadway Compound Roof in Zhaogu No.1 Mine
														[J]. COAL ENGINEERING, 2019, 51(5): 123-128. | 
																																																																																
													| [13] | . 
														
															Asymmetric deformation and failure characteristic of the roadway surrounding rock and its control under close distance gob
														[J]. COAL ENGINEERING, 2019, 51(4): 26-29. | 
																																																																																
													| [14] | . 
														
															Study on the influence of dimensional effect of rectangular roadway on the stability of surrounding rock of roadway
														[J]. COAL ENGINEERING, 2019, 51(4): 62-67. | 
																																																																																
													| [15] | . 
														
															
														[J]. COAL ENGINEERING, 2019, 51(3): 13-17. |