| [1] |
.
Construction of an intelligent open-pit mining technology system driven by knowledge graph
[J]. Coal Engineering, 2026, 58(8): 193-202.
|
| [2] |
.
Research on Operational Modes and Development-Transportation System Layout of Bucket Wheel Continuous Coal Mining Process
[J]. Coal Engineering, 2026, 58(7): 10-17.
|
| [3] |
.
Study on working face length and east
end-wall push-back internal dumping method in the first mining area of
Hongshaquan Open-pit Coal Mine
#br#
[J]. Coal Engineering, 2026, 58(6): 21-28.
|
| [4] |
.
Optimization of the Steering Scheme for the Baorixile mining Area Based on ELECTRE
[J]. Coal Engineering, 2026, 58(5): 29-34.
|
| [5] |
.
Research on the retention mode and height
of trenches between mining areas of Xiwan Open-pit Coal Mine
#br#
[J]. Coal Engineering, 2026, 58(4): 26-32.
|
| [6] |
.
Combination optimization and verification of cylindrical charge delay time driven by coal-rock crushing efficiency
[J]. Coal Engineering, 2025, 57(9): 146-155.
|
| [7] |
.
Mining plan for the western steep slope of Hongshaquan Open-pit Coal Mine
[J]. Coal Engineering, 2025, 57(5): 17-24.
|
| [8] |
.
Research on the Application of highwall mining system in Hongshaquan Open Pit Mine
[J]. Coal Engineering, 2024, 56(7): 105-109.
|
| [9] |
.
[J]. Coal Engineering, 2024, 56(7): 200-204.
|
| [10] |
.
An IGWO-BPNN-based method for open-pit mine truck failure prediction
[J]. Coal Engineering, 2023, 55(12): 114-120.
|
| [11] |
.
Full retention ditch internal dumping scheme in the end of the first mining area for Hequ Open-pit Coal Mine#br#
[J]. Coal Engineering, 2023, 55(12): 121-127.
|
| [12] |
.
Present Situation of Drainage and Implementation Effect of Water Cutoff Curtain in Yuanbaoshan Open-pit Coal Mine
[J]. Coal Engineering, 2023, 55(11): 77-82.
|
| [13] |
.
Optimization of Coal Production Capacity in Heidaigou Open-pit Coal Mine with Combined Mining System
[J]. Coal Engineering, 2023, 55(11): 108-114.
|
| [14] |
.
Field test on the reasonable ultra-depth of the borehole in open mine bench blasting
[J]. Coal Engineering, 2023, 55(10): 55-60.
|
| [15] |
.
Research on Blasting Vibration Velocity Prediction and Safety Allowable Distance in Anjialing Coal Mine
[J]. Coal Engineering, 2023, 55(10): 156-161.
|