[an error occurred while processing this directive]

Coal Engineering ›› 2023, Vol. 55 ›› Issue (6): 1-6.doi: 10.11799/ce202306001

    Next Articles

Design Method for Regional Erosion Prevention in the Feasibility Study Stage of Rockburst Mines

  

  • Received:2023-05-05 Revised:2023-06-01 Online:2023-06-20 Published:2023-06-30

Abstract:

At present, the systematic design method and system for regional prevention of rockburst have not been established in the mine design stage. In order to facilitate the design department to integrate regional awareness of rockburst prevention into the main plan of the new mine design stage, and reduce the difficulty and intensity of preventing rockburst during the production period of the mine. This article proposes the steps and methods for integrating regional awareness of rock burst prevention and control into the preliminary design of the mine, including the determination of rock burst tendency in the feasibility study stage of the mine, the determination of production capacity of rock burst mines, the implementation of regional anti-scour concept in the development and deployment of rock burst mines, and the combination of mining sequence and regional anti-scour. Based on the design example of the northern mine in the Hujilt mining area, Provide reference for the regional anti erosion design during the feasibility study stage of other similar newly built rock burst mines.

CLC Number: