[an error occurred while processing this directive]
A prediction method for height of the water-conducting fracture zone in fully mechanized mining faces based on the dominant controlling strata#br#
安 泽, 于秋鸽, 尹希武, 张玉军, 宋业杰, 张春会
Coal Engineering . 2026, (3): 145 -154 .  DOI: 10.11799/ce202603018