[1] 袁和生.煤矿岩巷液压钻车作业线现状与对策[J].建井技术,1997(4):41-43. YUAN He-sheng. The current situation and countermeasure og line of hydraulic drilling operations used in rock tunnel of coal mine[J]. Mine onstruction Technology,1997(4):41-43. [2] 路庆忠.岩巷掘进装岩运输综合出矸能力分析[J].西安矿业学院学报,1999(zl):138-140. LU Qing-zhong.Analysis of the comprehensive carrying capacity of waste rock in driving of rock drivage[J].Journal of Xi’an Mining Institute,1999(4):138-140. [3] 河北金牛能源股份有限公司,中国矿业大学(北京).煤矿岩巷高效掘进的基本理论与综合应用集成关键技术研究[R].2009. [4] 李清.深部大断面岩巷快速掘进技术研究[J]. 煤炭科学技术,2006,(10) [5] 姜金球.岩巷掘进施工机械化配套方案[J].建井技术,2000,(4).