三心圆拱岔口施工轮廓线画线方法的研究

张钢   

  1. 重庆千牛建设工程有限公司
  • 收稿日期:2014-01-13 修回日期:2014-04-24 出版日期:2014-09-10 发布日期:2014-09-10
  • 通讯作者: 张钢 E-mail:13608311297@163.com

three-centred arch construction control method of improvement

  • Received:2014-01-13 Revised:2014-04-24 Online:2014-09-10 Published:2014-09-10

摘要:

为了解决传统画线方法施工三心圆拱岔口画线工作量大、精度差的问题。根据椭圆与三心圆的相似性,采用椭圆定义和布设两条控制线的措施,只用9个数据控制三心圆拱岔口开挖轮廓尺寸(大巷开挖进入岔口后,新增3个记忆数据)。达到了三心圆拱岔口施工画线快捷、方便、精准的目的。使开挖三心圆拱巷道岔口画轮廓线的工效提高了数十倍,三心圆拱岔口施工的成型质量得到了明显的改善。

Abstract:

in order to solve the traditional line drawing method construction three-centred arch line drawing big workload, poor precision. the author according to the similarity of elliptic with three heart round, using elliptical definition and setting two line of control measures by using only nine data control three heart arch fork excavation contour size(alleys excavation after entering the fork, only add three memory data). up to the three-centred arch construction line drawing quick, convenient and accurate.Make arch tunnel excavation three-centred arch of the contour line efficiency improved dozens of times and three heart arch fork construction of forming quality has been improved.