摘要: 结合显德汪矿九采区东翼的实际情况,提出了以巷旁无充填沿空留巷为核心的无煤柱连续开采技术,研究设计了具有强力切顶、高阻让压和可缩协调等组合支架,并对单体液压支柱的支护密度进行了计算,通过工作面开采与留巷支护的时空演化关系分析,最终形成了“采—留—修—铺—搬”的时空衔接开采技术,实现了两相邻工作面的快速连续高效开采,创造了可观的经济效益。
关键词: 连续开采, 沿空留巷, 切顶, 支护密度
Abstract: Combined with the practical situation of east flank in mining area No. 9 of Xiandewang Colliery, the technology of continuous mining without coal pillar centralizing in gob-side entry retaining without roadside packing was put forward. Besides, the combination support with function of superpower roof cutting, high resistance transfer pressure and yielding coordination was designed; the support density of single hydraulic prop was calculated. By the relation analysis between face mining and roadway retained support, the arranging construction of mining – retain – maintenance – laying – moving was formed. Practice result has shown that this set of technology realized the continuous and efficient mining and created Considerable economic benefits.
Key words: continuous mining, gob-side entry retaining, superpower roof cutting, support density
中图分类号:
TD823.25+1
张帅. 薄煤层无煤柱连续开采技术[J]. 煤炭工程, 2015, 47(1): 18-21.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://www.coale.com.cn/CN/10.11799/ce201501006
http://www.coale.com.cn/CN/Y2015/V47/I1/18