煤炭工程 ›› 2015, Vol. 47 ›› Issue (2): 41-43.doi: 10.11799/ce201502013

• 施工技术 • 上一篇    下一篇

立井井筒过含水老空巷综合支护及堵水技术

段文超1,宋朝阳1,毛清华1,张俊峰2   

  1. 1. 晋城煤业集团勘察设计院有限责任公司
    2. 山西晋城煤业集团勘察设计院有限公司
  • 收稿日期:2014-02-12 修回日期:2014-06-25 出版日期:2015-02-10 发布日期:2015-02-15
  • 通讯作者: 段文超 E-mail:wenchao336@sina.com

Grouting Water Sealing Technology for Mine Shaft Sinking through Water Bearing Goaf

  • Received:2014-02-12 Revised:2014-06-25 Online:2015-02-10 Published:2015-02-15

摘要: 摘要:针对立井井筒过含水老空巷引起的围岩冒落空洞和突水问题,结合润东煤业回风立井现场施工情况,提出了“联合支护+注浆充填”综合支护技术,使得立井顺利通过冒落带空洞破碎段,同时向含水老空巷注浆形成隔水充填带,有效封堵突水通道,保证立井施工安全与施工质量。结果表明:应用注浆充填堵水技术后,井筒涌水量从50m3/h降到0.5m3/h以下,堵水效果明显;同时采用“联合支护+注浆充填”技术支护冒落带空洞后,井筒破碎段围岩承载性能和抗变形能力显著提高,井壁完整无断裂现象,支护效果显著。

关键词: 关键字:立井井筒, 含水老空巷, 围岩冒落, 联合支护+注浆充填, 堵水

Abstract: Abstract:Against the problem of surrouding rock falling cavity and water inrush in mine shaft sinking through water bearing goaf, in combined with actual construction situation of return air shaft in Rundong coal mine, the paper provided the technology of “combined supporting and grouting fill” to make mine shaft smoothly through caving zone cavity; meanwhile in order to ensure the construction safety and construction quality of mine shaft, grouting in mine water bearing used roadway to form blocking water filling body for blocking the passage of water inrush. The results show that mine water yield changed from 50 square meters per hour to 0.5 square meters per hour after applicating the technology of grout-filling blocking water, the water plugging effect is obvious; at the same time after applicating the technology of “combined supporting and grouting fill” for supporting surrouding rock falling cavity, bearing capacity and deformation resistance of mine shaft surrounding rock in broken section significantly improve, and the wall is complete without breaking, supporting effect is significant.

Key words: Key words: mine shaft, mine water bearing used roadway, surrouding rock fall, combined supporting and grouting fill, water sealing