煤炭工程 ›› 2015, Vol. 47 ›› Issue (3): 35-37.doi: 10.11799/ce201503012
• 设计技术 • 上一篇 下一篇
王磊
收稿日期:
修回日期:
出版日期:
发布日期:
通讯作者:
Received:
Revised:
Online:
Published:
摘要: 针对煤矿工业广场设施建筑布局存在的不合理现象,采用SLP法对煤矿工业广场设施建筑进行物流、人流与应急部门的关联分析,绘制出煤矿工业广场设施建筑位置关系图和面积关系图。通过加权因素法对优化前后的设施建筑布局的评价,论证了SLP法在煤矿工业广场设施建筑布局的应用效果,同时为多灾害煤矿提供了一种新的煤矿工业广场设施建筑布局模式。
关键词: 煤矿工业广场, 应急部门, 系统布置设计法, 相关表
Abstract: Directed against the unreasonable phenomena existing in the construction layout of coal industry square facilities, this paper, adopting the SLP method to have a correlation analysis of the logistics, flow and emergency department, drew the location diagram and area diagram for the facilities. Through evaluation of the construction layouts before and after optimization with weighting factor method, the applied effect of SLP in the layout was demonstrated. Meanwhile this paper provided a new construction mode of coal industry square facility layout for the coal mines with frequent disasters.
Key words: Coal industry square, emergency department, systematic planning layout, correlation table
中图分类号:
TD22
宁芳,王磊,杨铭,等. 基于SLP煤矿工业广场设施应急优化布置[J]. 煤炭工程, 2015, 47(3): 35-37.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://www.coale.com.cn/CN/10.11799/ce201503012
http://www.coale.com.cn/CN/Y2015/V47/I3/35