煤炭工程 ›› 2015, Vol. 47 ›› Issue (8): 35-37.doi: 10.11799/ce201508013
• 设计技术 • 上一篇 下一篇
高智伟,郑伟生,陈凯媛
收稿日期:
修回日期:
出版日期:
发布日期:
通讯作者:
Received:
Revised:
Online:
Published:
摘要: 以沙拉吉达煤矿工业场地为例,结合风沙地区独特的自然地形地貌,根据项目的建设要求及建设条件,对工业场地平面布置和竖向设计两方面,阐述了风沙地区总图设计优化思路及需要着重考虑的问题;并以厂前区为重点,加以深层次的剖析,为以后沙漠、戈壁滩等风沙地区的工业场地总图设计提供借鉴。
关键词: 风沙地区, 工业场地, 总平面布置, 竖向设计
Abstract: Based on Sha La Ji Da coal industry area as an example, combined with sandy area unique natural landscape, according to the project construction requirements and construction conditions, on the industrial site layout and vertical design, expounds the sandy area layout design optimization ideas and the need to focus on problems; and the former factory district as the focus, deep analysis, to provide references for future desert and Gobi wind sand area the industrial site of the general layout design.
Key words: sandy area, industrial area, general layout, vertical design
中图分类号:
TD214
高智伟,郑伟生,陈凯媛. 风沙地区工业场地设计探讨[J]. 煤炭工程, 2015, 47(8): 35-37.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://www.coale.com.cn/CN/10.11799/ce201508013
http://www.coale.com.cn/CN/Y2015/V47/I8/35