煤炭工程 ›› 2016, Vol. 48 ›› Issue (6): 1-3.doi: 10.11799/ce201606001
• 设计技术 • 下一篇
杨俊哲1,辛德林2
收稿日期:
修回日期:
出版日期:
发布日期:
通讯作者:
Received:
Revised:
Online:
Published:
摘要: 结合盾构法施工煤矿缓坡斜井的特点,提出了几种长距离盾构法斜井施工的通风系统形式,经多方案比较,最终确定采用单风管压入式通风系统方案。研究成果应用于示范工程,通风系统稳定,通风效果好,为盾构安全施工提供了保障。
关键词: 盾构法, 缓坡斜井, 通风系统, 局部通风, 压入式通风
Abstract: Combined with the features of mine shaft shield construction,the several form of Combined with the features of mine shaft shield construction,the several form of ventilation system is proposed and compared for mine shaft shield construction with long distance and gentle slope. Finally a single push-duct ventilation system is adopted. The research results are applied in the demonstration project,the ventilation system is stability,ventilated effect is good,it has provided the safeguard for the safety of shield construction.
中图分类号:
TD262
杨俊哲,辛德林,张世良,等. 长距离缓坡煤矿斜井盾构法施工通风系统研究[J]. 煤炭工程, 2016, 48(6): 1-3.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://www.coale.com.cn/CN/10.11799/ce201606001
http://www.coale.com.cn/CN/Y2016/V48/I6/1