煤炭工程 ›› 2017, Vol. 49 ›› Issue (4): 1-3.doi: 10.11799/ce201704001

• 设计技术 •    下一篇

编制煤炭矿区总体规划的影响因素分析探讨

黄磊   

  1. 新疆煤炭设计研究院有限责任公司
  • 收稿日期:2016-04-05 修回日期:2016-06-28 出版日期:2017-04-09 发布日期:2017-05-16
  • 通讯作者: 黄磊 E-mail:57212958@qq.com

Analysis On The Influencing Factors Of The Overall Preparation Of The Coal Mining Area

  • Received:2016-04-05 Revised:2016-06-28 Online:2017-04-09 Published:2017-05-16

摘要: 受多方因素影响,煤炭矿区总体规划编制、审查、修改、批复周期较长,结合新疆8部总体规划参编经验,针对矿区地质总结报告编制深度不足、规划原则不清晰及其他规划中经常遇到的问题,从项目管理和设计角度,对影响煤炭矿区总体规划编制的几个关键问题进行了分析和探讨,以实际案例分享遇到过的困难、取得的经验,提出对策和建议,以供设计参考。

关键词: 总体规划, 矿区边界, 勘探程度, 开发原则, 开发方式

Abstract: Affected by multiple factors, the overall planning of the coal mining area, review, modify, approval cycle is longer, based on the experience of the 8 master plan of Xinjiang Province, the Lack of depth of the geological summary report of the mining area, the planning principle is not clear, and other problems often encountered in other planning, From the perspective of project management and design, analysis and Discussion on several key problems in the coal mining area master plan compilation, to share the difficulties encountered in the actual case, put forward countermeasures and suggestions,for design reference.

中图分类号: