煤炭工程 ›› 2017, Vol. 49 ›› Issue (10): 69-72.doi: 10.11799/ce201710017
• 设计技术 • 上一篇 下一篇
刘健康
收稿日期:
修回日期:
出版日期:
发布日期:
通讯作者:
Received:
Revised:
Online:
Published:
摘要: 通过对昶旭煤矿受煤坑挡土墙进行加筋土式和扶壁式两个方案的比选,确定了采用扶壁式挡土墙的设计方案。对扶壁式挡土墙计算采用软件计算和人工复核的方法,确保了挡土墙计算分析结果的严谨性和可靠性,使计算结果更合理的指导挡土墙的结构设计。
Abstract: With a comparison between the reinforced soil type retaining wall and counterfort type retaining wall plans for the coal receiving pit in Chang xu coal mine,a design plan with the counterfort type was determined. The counterfort type retaining wall was calculated with a software computation and manual recheck method in order to ensure a strictness and reliability of the computation and analysis results of the retaining wall. Thus the computation results could more rationally guide the structure design of the retaining wall.
中图分类号:
TD223
刘健康,张振宇. 受煤坑高挡土墙的结构设计探讨[J]. 煤炭工程, 2017, 49(10): 69-72.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://www.coale.com.cn/CN/10.11799/ce201710017
http://www.coale.com.cn/CN/Y2017/V49/I10/69