[1] 刘崇凌. 薄煤层膏体巷旁充填沿空留巷技术研究与应用[D]. 青岛: 山东科技大学, 2011.
[2] 刘坤, 张晓明, 李家桌, 等. 薄煤层坚硬顶板工作面沿空留巷技术实践[J]. 煤炭科学技术, 2011,39(4): 17-20.
Liu Kun, Zhang Xiaoming, Li Jiazhuo, et al. Practices on gateway retaining along goaf side in thin seam with hard roof[J]. Coal Science and Technology, 2011,39(4): 17-20.
[3] 周建峰, 崔巍. 两硬薄煤层沿空留巷巷旁充填支护技术[J]. 煤炭科学技术, 2014,42(4): 19-22.
Zhou Jianfeng, Cui Wei. Technology of gob-side entry retaining and roadside filling support in hard roof and hard-thin coal seam[J]. Coal Science and Technology, 2014,42(4): 19-22.
[4] 柏建彪, 周华强, 侯朝炯, 等. 沿空留巷巷旁支护技术的发展[J]. 中国矿业大学学报, 2004,33(2): 183-186.
Bai Jianbiao, Zhou Huaqiang, Hou Chaojiong. Development of support technology beside roadway in goaf-side entry retaining for next sublevel[J]. Journal of China University of Mining & Technology, 2004,33(2): 183-186.
[5] 亓佳利. 薄煤层坚硬石灰岩顶板条件下沿空留巷技术研究及应用[D]. 青岛: 山东科技大学, 2011.
[6] 孙晓明, 刘鑫, 梁广锋, 等. 薄煤层切顶卸压沿空留巷关键参数研究[J]. 岩石力学与工程学报, 2014,33(7): 1449-1456.
Sun Xiaoming, Liu Xin, Liang Guangfeng, et al. Key parameters of gob-side entry retaining formed by roof cut and pressure releasing in thin coal seams[J]. Chinese Journal of Rock Mechanics and Engineering, 2014,33(7): 1449-1456.
[7] 白书民. 薄煤层无巷旁充填沿空留巷技术研究[J]. 煤炭科学技术, 2012,40(11): 42-44.
Bai Shuming. Study on technology of gateway retained along goaf with no gateway sidewall backfill in thin seam[J]. Coal Science and Technology, 2012,40(11): 42-44.
[8] 武善元, 贾凯军, 徐庆国. 薄煤层综采新型高水材料巷旁充填沿空留巷技术研究[J]. 煤炭工程, 2013(8): 50-53.
Wu Shanyuan, Jia Kaijun, Xu Qingguo. Research on gob-side entry retaining with high water-content materials in thin coal seam[J]. Coal Engineering, 2013(8): 50-53.
[9] 孙恒虎, 赵炳利. 沿空留巷的理论与实践[M]. 北京: 煤炭工业出版社, 1993.
Sun Henghu, Zhao Bingli. The theory and practice of gob-side entry retaining[M]. Beijing: China Coal Industry Publishing House,1993.
[10] 陈勇, 柏建彪, 朱涛垒, 等. 沿空留巷巷旁支护体作用机制及工程应用[J]. 岩土力学, 2012,32(05): 1427-1432.
Chen Yong, Bai Jianbiao, Zhu Taolei, et al. Mechanisms of roadside support in gob-side entry retaining and its application[J]. Rock and Soil Mechanics. 2012, 32(05): 1427-1432.
[11] 华心祝, 马俊枫, 许庭教. 锚杆支护巷道巷旁锚索加强支护沿空留巷围岩控制机理研究与应用[J]. 岩石力学与工程学报, 2005,24(12): 2107-2112.
Hua Xinzhu, Ma Junfeng, Xu Tingjiao. Study on controlling mechanism of surrounding rocks of gob-side entry with combination of roadside reinforced cable supporting and roadway bolt supporting, and its application[JT]. Chinese Journal of Rock Mechanics and Engineering, 2005,24(12): 2107-2112.
[12] 侯朝炯, 马念杰. 煤层巷道两帮煤体应力和极限平衡区的探讨[J]. 煤炭学报, 1989(4): 21-29.
Hou Chaojiong, Ma Nianjie. Stress in in-seam roadway sides and limit equilibrium zone[J]. Journal of China Coal Society, 1989(4): 21-29.
[13] 柏建彪, 侯朝炯, 张长根, 等. 高水材料充填空巷的工业性试验[J]. 煤炭科学技术, 2000,28(10): 30-31.
Bai Jianbiao, Hou Chaojiong, Zhang Changgen, et al. Industrial test of high moisture quick-setting backfill material to abandoned roadway[J]. Coal Science and Technology. 2000,28(10): 30-31.
|