煤炭工程 ›› 2019, Vol. 51 ›› Issue (5): 78-81.doi: 10.11799/ce201905019

• 施工技术 • 上一篇    下一篇

6m大采高沿空留巷巷旁支护研究

李晓白,潘海兵,石景帅,雷平博   

  1. 陕西开拓建筑科技有限公司
  • 收稿日期:2018-02-02 修回日期:2018-05-13 出版日期:2019-05-20 发布日期:2019-06-10
  • 通讯作者: 雷平博 E-mail:1037109857@qq.com

Study on supporting technology of 6m high mining height along goaf

  • Received:2018-02-02 Revised:2018-05-13 Online:2019-05-20 Published:2019-06-10

摘要: 为了适应大采高工作面沿空留巷,在霍尔辛赫煤矿6m大采高工作面进行了柔模混凝土沿空留巷支护设计。重点设计研究了巷旁支护参数、底板加固参数、临时加强支护参数。结果表明:6m大采高工作面柔模混凝土沿空留巷支护参数合理,效果良好,具有良好的经济效益和应用前景。

关键词: 大采高, 沿空留巷, 巷旁支护, 厚煤层, 柔模混凝土墙体

Abstract: Based on the engineering background of 6m high mining face in a mine, the support design of flexible die concrete along goaf is carried out. Focus on the design of roadway support parameters and floor reinforcement parameters, temporary strengthening supporting parameters. The engineering practice shows that the support parameters of the flexible mode concrete along the empty side of the 6m high mining face are reasonable and the effect is good, and has good economic benefit and application prospect.