王家塔煤矿半连续排矸运输系统设计改造

韩亮   

  1. 中国煤炭科工集团北京天地华泰采矿工程技术有限公司
  • 收稿日期:2012-12-25 修回日期:2013-01-18 出版日期:2013-12-10 发布日期:2013-12-10
  • 通讯作者: 韩亮 E-mail:hanliang_1985@sina.com

Remodel of Semi-Continuous Waste Rock Discharging Transportation System in WangJiaTa Colliery

  • Received:2012-12-25 Revised:2013-01-18 Online:2013-12-10 Published:2013-12-10

摘要:

通过对原煤主运输系统的改造,构建了岩巷半连续排矸系统,迎头矸石通过胶带输送机与刮板输送机转载至临时储矸巷,待不出煤时利用改造后的排矸系统排弃临时储矸巷堆积的矸石。该系统的应用将显著提高王家塔煤矿的排矸运输能力,大幅降低井下安全隐患,同时节约了煤矿生产运营成本。

关键词: 主运输系统, 半连续排矸系统, 犁式卸料器, 溜煤口改造

Abstract:

Based on remodeling of raw coal main transport system, the colliery constructs a semi-continuous waste rock discharging system. Waste rock will be transferred to temporary storage roadway through the belt conveyor and scraper conveyor, and will be discharged using this system while coal is not in use. The application of this system will significantly improve the waste rock discharging transport capacity of this colliery, greatly reduced potential risk, as well as saving the coal mine production and operating cost.

Key words: the main transport system, semi-continuous waste rock discharging system, plow discharger, Slip coal mouth remodeling