[1]王国法,张德生.煤炭智能化综采技术创新实践与发展展望[J].中国矿业大学学报,2018,47(03):459-467. [2]Zong K, Zhang P, Wang Pengjiang. Multifactor Analysis of Roadheader’s Body Pose Responses during the Horizontal Cutting Process. Shock and Vibration. 2018[3]Dolipski, Marian. The Relevance of the Rotational speed of Roadheader Cutting Heads According to the Energy Consumption of the Cutting Process. Archives of Mining Science. 2013. Vol. 58(1).?pp. 3-19.[4]Wang Suyu,?Wu Miao. Cutting trajectory planning of sections with complex composition for roadheader. Proceedings of the institution of mechanical engineers part C-journal of mechanical engineering science. 2019. Vol. 233(4). pp. 1441-1452.[5]Wang Jinhua. Development and prospect on fully mechanized mining in Chinese coal mines. International Journal of Coal Science & Technology. 2014.Vol 1(3). pp.153-260.[6]Yang Yang, Guowei Li, Aihui Yuan. Performance Analysis of a Hybrid Power Cutting System for Roadheader. Mathematical Problems in Engineering. 2017. p. 12.[7]Wang Jinhua, Yu Bin, Kang Hongpu. Key technologies and equipment for a fully mechanized top-coal caving operation with a large mining height at ultra-thick coal seams. International Journal of Coal Science & Technology. 2015. Vol 2(2). pp. 97-161.[8]Seker, Sadi Evren. Performance prediction of roadheaders using ensemble machine learning techniques. Neural Comouting & Applications. 2019. Vol 31(4). pp. 1103-1116.[9]Cheluszka, Piotr. Modelling the dynamics of a drive of Boom-type Roadheader cutting heads at adjustable angular speed. Archives of Mining Science. 2018. Vol 63(1). pp 183-204.[10]Chen Y, Lu A, Mao X. Nonlinear Dynamics Mechanism of Rock Burst Induced by the Instability of the Layer-Crack Plate Structure in the Coal Wall in Deep Coal Mining. Shock and Vibration. 2017. [11]Faradonbeh R.S., Salimi A, Monjezi M. Roadheader performance prediction using genetic programming (GP) and gene expression programming (GEP) techniques. Environmental Earth Sciences. Vol 76(16). pp. 584. 2017.[12]Ergin H, Acaroglu O. The effect of machine design parameters on the stability of a roadheader. Tunnelling and underground space technology. 2007. Vol 22(1). pp. 80-89.[13]Zong Kai, Zhang Peng, Wang Pengjiang. Regulation of the cutting arm’s swing angle run-out perpendicular to the fixed cutting direction. Journal of China coal society. 2017. p. 1004.[14]郝建生.煤矿巷道掘进装备关键技术现状和展望[J].煤炭科学技术,2014,42(08):69-74.[15]高峰,王苏彧,高娟,李睿,吴淼.掘进机截割臂摆速自动控制方法研究[J].工矿自动化,2011,37(08):38-41.[16]张兰胜,赵元宇,田劼,唐秀山,刘强,吴淼.实际工况下的掘进机截割头载荷谱研究[J].煤炭工程,2016,48(01):133-135.[17]蒲志新,丁丹丹,周淑烨.基于模糊PID控制的掘进机恒功率控制系统的研究[J].测控技术,2015,34(09):73-75.[18]李晓豁,刘志森,张飞虎,李烨健.基于GAs模糊控制的掘进机截割电动机恒功率控制[J].计算机系统应用,2012,21(05):149-152.[19]冯婧,周宏范,朱一凡.煤矿井下巷道掘进机截割电动机调速系统的研究[J].矿山机械,2012,40(01):14-17. |