煤炭工程 ›› 2024, Vol. 56 ›› Issue (1): 1-7.doi: 10.11799/ce202401001

• 设计技术 •    下一篇

京西关停矿井开发利用规划研究

李学彬,周玉颖   

  1. 华北科技学院
  • 收稿日期:2023-02-02 修回日期:2023-08-31 出版日期:2024-01-20 发布日期:2024-01-29
  • 通讯作者: 周玉颖 E-mail:2096951501@qq.com

Case Study on Development and Utilization Planning of Closed Mines in West Beijing -- National Experimental and practical training Base of Pre-control and emergency treatment Technology of Safety production Accidents and popular science

  • Received:2023-02-02 Revised:2023-08-31 Online:2024-01-20 Published:2024-01-29

摘要: 京西矿井关停后将形成71万m3的可利用特殊地下空间和774万m2的地面工业广场,近千亿资产被闲置。针对京西矿井现状,响应北京总体规划,通过建设国家级安全生产事故预控与应急处置技术实验实训和科普基地(一期)作为京西关停矿井开发利用的首期工程。京西基地建设内容包括防灾减灾救灾技术支撑平台、应急管理能力培养课程体系、基础条件建设、应急管理信息化研发实训平台、应急管理特色学历教育课程体系、应急实训演练与知识文化科普平台6部分,具体由26个建设模块组成,共需要配置专业仪器设备1827台、开发课程54门、图书文献156套、引进培训师资180人次、改扩建工程设施1609套(项),利用千军台井地下巷道约3147 m,最终建成服务安全生产和应急管理的国际一流科教培基地。

关键词: 京西关停矿井, 废弃矿井, 安全生产, 应急管理, 科教培基地

Abstract: After the closure of the Beijing West mine, 710,000 m3 of available special underground space and 774,000 m2 of ground industrial square will be formed, and nearly 100 billion of assets will be idle. Therefore, the development and utilization project of the Beijing West mine closure will be divided into three phases to create a sustainable green ecological industrial belt, namely: "Science popularization and education as the leader, health industry as the leading, cultural tourism and leisure as the feature, green smart energy as the foundation". The National Production Safety Accident Pre-control and Emergency Treatment Technology Experiment and Training and Popular Science Base (Phase I) project is the first phase of the development and utilization of Beijing West mine shutdown. It includes six parts: disaster prevention technology support platform, emergency management ability training curriculum system, emergency management information research and training platform for basic conditions construction, emergency management characteristic education curriculum system, emergency practical training and drill and knowledge and culture popularization platform, which are specifically composed of 26 construction modules. A total of 1,827 sets of professional instruments and equipment, 54 development courses, 156 sets of books and literature, 180 trained teachers introduced, 1,609 sets of reconstruction and expansion facilities (items), and 3147m underground roadway of Qianjuntai well, striving to build an international first-class science and education base serving production safety and emergency management. It is divided into two parts: (1) The Beijing West Scientific Research Base will transform the original ground and underground building facilities of Qianjuntai, build functional modules of disaster prevention and emergency technical equipment R&D, public emergency drill and science popularization, and trainees' practical training and practice, so as to form a working and living environment for 200 people; (2) Beijing Eastern Training Base has established a scene simulation and safety and emergency ability training platform for disaster prevention institutions in the South campus of North China Institute of Science and Technology, and has used Internet + to share the resources of Beijing Eastern and Beijing West to improve the professional level of safety emergency students and meet the training requirements of 300 people. At present, the construction plan of the base has been approved, and the special fund of 300 million yuan for safety production prevention and emergency has been allocated to Jingmei Group, which has completion of preliminary testing, design and bidding work, has entered the construction phase.