[1]刘峰, 曹文君, 张建明等.我国煤炭工业科技创新进展及“十四五”发展方向[J].煤炭学报, 2021, 46(01):1-15[2]LIU Feng, CAO Wenjun, ZHANG Jianming, et al.Current technological innovation and development direction of the 14th Five-Year Plan period in China coal industry[J].Journal of China Coal Society, 2021, 46(1):1-15[3]谭杰, 刘京坤, 李科伟等.赵楼矿井建井工期控制[J].煤炭工程, 2005, 37(6):61-63[4]Tan Jie, Liu Jingkun, Li Kewei, et al.Construction duration control in Zhaolou Mine[J].Coal Engineering, 2005, 37(6):61-63[5]谢松岩.新街台格庙矿区总体规划设计主要特色成果研究[J].煤炭工程, 2014, 46(1):9-11[6]XIE Song-yan.Study on Main Feature Achievements of Over-all Planning Design for Xinjie Taigemiao Mining Area[J].Coal Engineering, 2014, 46(1):9-11[7]纪洪广, 蒋华, 宋朝阳, 等.弱胶结砂岩遇水软化过程细观结构演化及断口形貌分析[J].煤炭学报, 2018, 43(4):993-999[8]JI Hongguang, JIANG Hua, SONG Zhaoyang.et alAnalysis on the microstructure evolution and fracture morphology dur-ing the softening process of weakly cemented sand-stone[J].Journal of China Coal Society, 2018, 43(4):993-999[9]窦玉康.浅谈塔然高勒矿井建设的经验教训[J].煤炭工程, 2012, 44(s1):27-28[10]Dou yukang.A Brief Discussion on the Experience and Les-sons Learned from the Construction of Tarangaole Mine[J].Coal Engineering, 2012, 44(s1):27-28[11]王道均, 王炎江, 万援朝.西部地区软岩含水地层建井技术方案研究和分析[J].建井技术, 2021, 42(6):26-28[12]WANG Daojun, WANG Yanjiang, WAN Yuanchao.Study and Analysis on Technical Plan of Mine Shaft Construction in Soft Rock Aquifer in West China Area[J].Mine Construction Tech-nology, 2021, 42(6):26-28[13]翟所国, 赵庆民, 王茂亭, 等.立井井筒砂岩水特性分析及治理方法[J].山东科技大学学报自然科学版, 2004, 23(2):15-18[14]ZHAI Suo-guo, ZHAO Qing-min, WANG mao-ting, et al.Characteristic Analysis and Control Methods of the Sandstone Water in Vertical Shafts[J].Journal of Shandong University of Science and Technology (Natural Science), 2004, 23(2):15-18[15].中华人民共和国国家标准, 《煤矿井巷工程施工标准》(GB/T50511-2022)[16]National Standards of the People' s Republic of China, Stand-ard for construction of shaft sinking and drifting of coal mine[S].(GB/T50511-2022) |