煤炭工程 ›› 2025, Vol. 57 ›› Issue (9): 84-90.doi: 10. 11799/ ce202509012

• 施工技术 • 上一篇    下一篇

深大槽仓基坑土钉支护工程稳定性监测研究

况联飞,覃业双,吕亚,邵宇,付亚军   

  1. 1. 中国矿业大学 深地工程智能建造与健康运维全国重点实验室,江苏 徐州 221116

    2. 江苏京沪高速公路有限公司,江苏 南京 210009

    3. 中煤科工集团北京华宇工程有限公司,北京 100120

  • 收稿日期:2025-01-22 修回日期:2025-04-22 出版日期:2025-09-10 发布日期:2025-10-13
  • 通讯作者: 况联飞 E-mail:klfcumt@126.com

Monitoring and Analysis of Soil Nailing Engineering Stability in Deep SeatedCoal Bunker Foundation Pit

  • Received:2025-01-22 Revised:2025-04-22 Online:2025-09-10 Published:2025-10-13

摘要:

针对超现行规范深大槽仓基坑土钉支护稳定性问题,基于现场实测获得深大槽仓基坑施工期变形与土钉受力一般特征。结果表明由于基坑上部粉细砂层较厚,坡顶个别测点水平位移超出了规范允许的3‰开挖深度限值。土钉轴力随基坑开挖不断增大,沿土钉长度方向上,上部土钉最大轴力一般出现在中部,而下部土钉最大轴力往往出现在中深部,个别土钉轴力甚至超出了传感器量程的25%,且上部填方工程将进一步加大边坡的滑塌范围。基于此,提出了在不增加总土钉长度基础上的土钉支护优化设计策略,即在增大上部土钉水平间距和适当减小下部土钉水平间距时,能够充分发挥上部土钉的支护性能,减小下部单根土钉支护面积,进而提高整个边坡的安全性。

关键词:

槽仓 , 基坑 , 土钉支护 , 现场监测 , 优化设计

Abstract:

Based on on-site measurements, the general characteristics of deformation and soil nail stress in the foundation pit of a deep trench warehouse were obtained to address the stability issues of soil nail support beyond current standards. The results indicate that due to the thick layer of fine sand on the upper part of the foundation pit, the horizontal displacement of some measuring points at the top of the slope exceeded the allowable excavation depth limit of 3‰ according to the specifications. The axial force of soil nails increases continuously with the excavation of the foundation pit. Along the length direction of the soil nails, the maximum axial force of the upper soil nails generally occurs in the middle, while the maximum axial force of the lower soil nails often occurs in the middle and deep parts. Some soil nail axial forces even exceed 25% of the sensor range, and the upper filling will further increase the sliding range of the slope. Based on this, an optimization design concept for soil nail support is proposed without increasing the total length of soil nails. By appropriately increasing the horizontal spacing between upper soil nails and decreasing the horizontal spacing between lower soil nails, the support performance of upper soil nails can be fully utilized, the support area of a single soil nail in the lower part can be reduced, and the safety of the entire slope can be improved.

中图分类号: