煤炭工程 ›› 2026, Vol. 58 ›› Issue (5): 49-56.doi: 10.11799/ce202605007

• 施工技术 • 上一篇    下一篇

特厚煤层综放开采覆岩离层注浆参数确定与效果验证 

李永恩,彭宝山,王彩云,晏 嘉,丁 杨,张丝诺,樊柏强   

  1. 1. 国家能源集团国源电力有限公司,北京 100033

    2. 中煤科工集团北京华宇工程有限公司,北京 100120

    3. 中煤地生态环境科技有限公司,北京 100070

  • 收稿日期:2025-06-25 修回日期:2025-07-16 出版日期:2026-05-15 发布日期:2026-05-27
  • 通讯作者: 樊柏强 E-mail:15737190917@163.com

Parameter determination and effect validation of overburden separation grouting for fully mechanized top coal caving in an extra-thick coal seam #br#

  • Received:2025-06-25 Revised:2025-07-16 Online:2026-05-15 Published:2026-05-27
  • Contact: 樊 柏强樊 E-mail:15737190917@163.com

摘要:

针对新疆准东矿区特厚煤层综放开采条件下地表沉陷严重的问题,需采用离层注浆等措施进行治理。为精准把控注浆层位、注浆时机与注浆量,提升覆岩沉陷控制效果,以准东二矿1101工作面为工程背景,首先基于关键层理论计算覆岩关键层层位与数量,预测离层可能发育的位置;再通过导水裂隙带发育高度计算,确定稳定有效的离层空间层位,从而选定注浆层位;并结合工作面推进过程中覆岩运移规律与离层发育特征,确定最佳注浆时机;随后依据均布载荷下薄板挠曲曲线进行二重积分,求解离层空间体积,初步预测注浆量;最后采用UDEC 数值模拟及现场微震实测数据对上述结果进行验证。研究结果表明:注浆层位应选择关键层 2下方的稳定离层空间,注浆时机宜控制在工作面回采至200~220m区间;理论计算得到的注浆体积约为1. 03×104m3,数值模拟结果为0. 89×104 m3,两者相对误差为13.6%,吻合性较好,验证了本次注浆层位、注浆时机及注浆量计算结果的合理性与可靠性。


Abstract:

As a part of the green mining technology system, the separation grouting technology can play a importment role in reducing the surface subsidence. In view of the serious problems of surface subsidence under the conditions of fully integrated mining of extra-thick coal seams in Xinjiang, effective measures such as separation grouting should be taken to control them. In this paper, the working face of 1101 of Zhundong No.2 Mine is taken as the research background, the key layers and quantities of overburden are calculated through the theory of key layers, and the possible horizons of the separation are predicted, and then the stable and effective separation space horizon is obtained by calculating the development height of the water conduction fracture zone, so as to determine the separation grouting horizon. Subsequently, according to the migration law of overburden and the development characteristics of separation during the advancement of the working face, the best time for grouting was determined. Then, according to the double integral of the deflection curve of the thin plate under uniform load, the space volume of the separation layer is solved, so as to preliminarily predict the size of the separation grouting amount.Finally, the above calculations are verified based on the results of numerical simulation analysis and the measured microseismic data. It is concluded that the key layer 2 should be selected for the horizon of separation grouting and grouting should be carried out between the mining of the working face and 200m~220m. Finally, it is concluded that the separation grouting volume is about 1.03×104m3. The separation grouting volume calculated from the simulation results is 0.89×104m3, and the error is 13.6%.

中图分类号: