煤炭工程 ›› 2011, Vol. 1 ›› Issue (10): 72-74.doi:

• 研究探讨 • 上一篇    下一篇

大柳塔煤矿12611-2综采面过断层的数值模拟研究

陈少璞,王滨   

  1. 内蒙古科技大学
  • 收稿日期:2010-10-08 修回日期:2010-11-24 出版日期:2011-10-10 发布日期:2011-10-10
  • 通讯作者: 王滨 E-mail:wber_2006@163.com

The Numerical Simulation Study of Da Liu ta Coal Mine 12611-2 Comprehensive Mechanized Mining Face Across the Fault

  • Received:2010-10-08 Revised:2010-11-24 Online:2011-10-10 Published:2011-10-10

摘要: 本文以大柳塔煤矿12611-2综采面过断层为背景,采用FLAC有限差分软件对12611-2综采面过断层、破碎带期间进行数值模拟研究,从而为综采面过断层的安全技术措施提供了一定的理论指导。

关键词: 综采面, 过断层, FLAC, 数值模拟

Abstract: This paper uses the fault of Da Liu ta coal mine 12611-2 fully mechanized mining face as the background, and applies FLAC finite difference software to do numerical simulation study about the period during the 12611-2 coal face faults across the fault and the fracture zones, which provides a theoretical guidance for the technical measures that fully mechanized mining face across the fault.

Key words: comprehensive mechanized mining face, through fault, FLAC, numerical simulation