关键线路法和概率分布确定采区准备工期的应用
周华龙
The Application of Construction Period in Mining Area Determine with Critical Path Method and Probability Distribution
煤炭工程 . 2016, (3): 145 -148 .  DOI: 10.11799/ce201603045