基于3DEC的露天矿内排压脚追踪距离优化分析
丁鑫品
Optimization Analyze on the Presser Foot Tracing Distance of Internal Dumping in Open-pit mine Based on 3DEC
煤炭工程 . 2018, (5): 37 -40 .  DOI: 10.11799/ce201805010