[1]郑文华, 等.地下工程测量[M].北京:煤炭工业出版社, 2007.(Zheng Wenhua, et al. Underground engineering survey[M]. Beijing: Coal Industry Press.2007)
[2]赵吉先,孙小荣.地下工程测量(第二版)[M].北京:测绘出版社, 2013.(Zhao Jixian, SUN Xiaorong .Underground engineering survey(Second Edition)[M]. Beijing: Surveying and Mapping Publishing House.2013)
[3]闫辉, 等.竖井联系测量的理论探讨与实践应用[J]. 煤矿现代化, 2013, (03): 98-100.(Yan Hui, et al. Theoretical exploration and practical application of vertical shaft connection measurement [J] Modernization of Coal Mines, 2013, (03): 98-100)[J].Modernization of Coal Mines, 2013, 03(114):98-100
[4]崔旭升, 等.双联系三角形法在竖井联系测量中的应用[J].大地测量与地球动力学, 2010, 30(02):156-159
[5]王晓梅.一井定向的误差分析[J].城市地质, 2011, 6(03):36-39
[6]范跃宇.矿山测量中一井定向三角形连接法的误差分析[J]. 华北国土资源, 2011, (03): 51-58.(Fan Yueyu. Error Analysis of One Well Directional Triangle Connection Method in Mine Surveying [J] North China Land and Resources, 2011, (03): 51-58)[J].华北国土资源, 2011, 03(44):51-58
[7]姜丙功.全站式陀螺仪的定向数据处理及精度评定[D]. 辽宁工程技术大学, 2012.(Jiang Binggong Directional data processing and accuracy evaluation of total station gyroscopes [D] Liaoning University of Engineering and Technology, 2012) |